Skip to content

Free calculator

What switching between companies costs you

Each time you move from one company or client to another, it takes a while to be properly back in the work. Multiply your switches a day by those minutes and your working days, and you get the hours lost each week. Grouping work by company cuts the switches, and this shows by how much.

Only the symbol changes. Nothing is converted.

switches

assumption: change this

minutes

assumption: change this. Time yourself for a few days: this matters more than any other figure here.

per hour

assumption: change this

days

assumption: change this

weeks

assumption: change this

switches

assumption: change this

Start again

Result

Lost to refocusing each week

6.7 hours

About 6.7 hours a week go to getting back up to speed, worth $46,000 a year. Grouping your work into 3 switches a day would give back about 4.2 hours a week.

Each week
6.7 hours
$1,000
Each month
25.6 hours
$3,833
Each year
306.7 hours
$46,000
Grouped by company
2.5 hours a week
saves $28,750 a year
Hours a week lost to refocusing
Hours a week lost to refocusing
WhatValue
As you work now6.7 hours
Grouped by company2.5 hours
How we worked this out
  • Each day: 8 switches × 10 minutes ÷ 60 = 1.33 hours.
  • Each week: 1.33 hours × 5 days = 6.67 hours, costing $1,000 at $150 an hour.
  • Each year: 6.7 hours × 46 weeks = 306.7 hours ($46,000). Each month is the year ÷ 12.
  • Grouped: 3 switches × 10 minutes × 5 days ÷ 60 = 2.5 hours a week, so $28,750 a year less.

How to use it

  1. Step 1: Count how many times on a normal day you move from one company or client to another.

  2. Step 2: Enter how many minutes it takes you to be fully back in the work after a switch. Time yourself for a few days rather than guessing.

  3. Step 3: Enter your hourly value, working days a week and weeks a year.

  4. Step 4: Enter how many switches a day you would make if you grouped your work by company, and compare.

A worked example

With the starting figures (8 switches a day, 10 minutes each, 5 days a week, 46 weeks, $150 an hour, 3 switches when batched):

  • Each day: 8 switches × 10 minutes ÷ 60 = 1.33 hours.
  • Each week: 1.33 hours × 5 days = 6.67 hours, costing $1,000 at $150 an hour.
  • Each year: 6.7 hours × 46 weeks = 306.7 hours ($46,000). Each month is the year ÷ 12.
  • Grouped: 3 switches × 10 minutes × 5 days ÷ 60 = 2.5 hours a week, so $28,750 a year less.

Result: 6.7 hours (Lost to refocusing each week). About 6.7 hours a week go to getting back up to speed, worth $46,000 a year. Grouping your work into 3 switches a day would give back about 4.2 hours a week.

Every starting figure on this page is an assumption. Put in your own.

Questions

Where does the refocus time come from?

From you. The default of 10 minutes is a placeholder, not a finding. For a few days, note when you switch and when you feel properly back in the work, then use your own average.

Is there research on this?

Yes, though it measures different things. In one lab study (Mark, Gudith and Klocke, CHI 2008), people who were interrupted finished their tasks as fast as others but reported more stress, frustration and time pressure. So part of the cost may show up as strain rather than minutes. This calculator counts only the minutes you enter.

What counts as a switch?

Moving your attention from one company's work to another's: answering a client message in the middle of another client's plan, or jumping into a different company's channel. Switching between tasks for the same company is not counted here.

What does batching mean here?

Doing a company's work in one or two blocks instead of dipping in and out all day. If you run three companies and give each a block, that is about three switches a day.

Is the lost time really lost?

Not always. Some refocusing is thinking you would do anyway. Treat the result as an upper bound and lower the minutes if it feels high.

See how Operators keeps this number down